The city officially opened in October 2007 and was constructed at a cost of HK$$2.2 . It was designed to cope with future development and expansion, especially for digital television production.
TVB City has a building area of over 110,000 square metres, 30% more than that the old headquarter, TV City, at Clearwater Bay. The facilities includes a 11-storey broadcasting center, workshops, a newsroom, a , 2 outdoor shooting sites and 22 production studios, of which "Studio 1" is one of the largest studio amongst all commercial television stations in Asia.
Reference
*
No comments:
Post a Comment